Extremely important for several sectors, the Clean Rooms are environments in which air quality and various other parameters are controlled, monitored and recorded (temperature, humidity, pressure, particles and airflow). This occurs in order to preserve the quality of the products handled and ensure the protection of professionals working on site.

There are several important factors that ensure they function perfectly, according to operational needs. Building a cleanroom requires adherence to specific and rigorous standards, and a specialized team to plan, execute, and conduct the necessary tests.
And it is in this sense that the Turn Key operation becomes differentiated, so that the environment is built with the greatest possible integrity.
And for you to have better knowledge about the term, its importance and how the operation works in practice, we have detailed everything about it.
After all, what is Turnkey?
The expression "Turn Key" literally comes from English and means "To Turn the Key" or "To Start". This term aims to describe a type of agreement in which only one supplier is hired to carry out the construction of the project, from beginning to end. That is, from the planning phase, choice of materials, execution and maintenance, everything is carried out by just one company.
In Turnkey operations, coordinated by Asmontec, the entire process is carried out in a planned manner, with the goal of providing a Clean Room with excellent operating conditions. Each step is meticulously executed to guarantee complete delivery and assembly within the established timeframe.
In conjunction with this, the following activities are carried out:
+ Design, detailing and development of all disciplines necessary for clean rooms, such as Air System, Utilities, Equipment and Electric;
+ Manufacturing of partition panels and false ceilings with cleanroom standard;
Manufacturing of doors and accessories in aluminum and stainless steel ;
+ Advice and consultancy in clean rooms;
+ Hiring sub-suppliers and monitoring them;
+ Manufacture and assembly of the projected scopes;
+ Verification and monitoring of the progress of the work seeking the complete supply.
How important is Turn Key for engineering projects?
A construction/engineering project is, for the most part, a collaboration between several teams from different sectors. Each team is responsible for a specific stage, according to their expertise. With a Turnkey project, the project has an important support base, as only one company is in charge of all stages. This means that the client will hire only one institution, with a fixed final price, which will manage the entire process and deliver the project in its entirety, exactly as designed, faithfully respecting the deadlines.
This optimizes processes, minimizes errors, increases productivity and accuracy, and reduces construction time. These factors are what make Turnkey projects so advantageous. The Cleanroom project then achieves much greater reliability. After all, choosing different partners to execute distinct stages can lead to problems during construction, such as:
+ Distinctions in quality between one service and another;
+ Lack of standardization in finishes;
+ Delays in certain sectors;
+ Need to redo work already completed.
With Turn Key these “mismatches” do not occur. As everything is executed by a single company, everything is also done and planned homogeneously, from beginning to end. See the main advantages of choosing this type of operation for the construction of your Clean Room:
+ Professionals prepared and knowledgeable on the subject, at all stages: design, production, assembly and maintenance;
+ Centralization of the project in a single company, which avoids delays, failures, communication noises and guarantees the good execution in all processes, from start to finish;
+ Full-time monitoring of the works manager who will closely check the entire process, thus ensuring a delivery of excellence.
For which segments is a Turn Key project best suited?
Any company that needs a Cleanroom can contract a Turnkey project. This option is the "dream" for any institution. It provides the highest efficiency in the controlled environment, regardless of the segment: laboratories, pharmaceutical, food, chemical, beverage, cosmetic, veterinary, electronics industries, research centers, hospitals, among others.
In fact, the more complex the project, the greater the processes, the operation becomes even more recommendable, precisely because of the characteristic of centralizing the steps in a single company. Which, as said before, considerably reduces the risk of failures, lack of communication and wasted time.
With effective performance and extensive knowledge gained through years of market experience, Asmontec serves all clients who need to build a Cleanroom, executing everything with the utmost integrity and responsibility, always taking care of the main operational needs of the site.

What are the differences between Turn Key EPC and EPCM?
As mentioned earlier, the idea behind Turnkey is to have a single company handling all processes, aiming to make everything faster, more practical, and more efficient. To achieve this, there are two distinct types of operations. See the differences between them below:
EPC – This is a type of contract in which the builder carries out the entire project, guaranteeing the complete execution of the scope, the preparation of architectural and engineering designs, details, and assembly plans. In addition, they are also responsible for the fundamental services necessary for the project's execution, such as the supply of labor, materials, and equipment required for the activities to take place.
ECPM – In this type of operation, the processes of project development and procurement of the necessary materials for the Cleanroom are also carried out. However, the construction does not take place, but rather the management of the work. In other words, the activity basically consists of project management.
Guarantees available on a Turn Key project
One key factor in the Turnkey model is reliability. The client, therefore, has the guarantee of complete project delivery (considering the types of operations mentioned above: EPC and EPCM). It is a low-risk model for the client. Asmontec takes full responsibility, always keeping the client informed about project updates.
CASE
Segment: Breast Implants
Turn Key projects already applied by Asmotec
Asmotec has already developed some projects in the Turn Key regime, one of them the Laboratory of Detectors at the National Laboratory of Synchrotron Light, an ISO 6 clean room was built, a necessary condition to guarantee the functionality of that environment.
We are also in the final stages of completing a project at a silicone implant manufacturing company, which involved the complete supply of Asmontec and includes over 500m² of cleanrooms with a wide variety of specifications. In this project, the cleanrooms took into account several regulations, all in accordance with specific norms and standards. In this case, the main one was ANVISA's RDC 50.
To hire the Turn Key operation for your Clean Room or to learn more about the project, contact our team.